Roadmapping and prioritisation skill 04 of 4
User story mapping
A user story map lays a product out as the story of someone using it, so a team can decide what to build first without losing the big picture. This skill makes an AI agent build the backbone, slice it into releases that each serve a user and a measurable outcome, and find the thin first slice worth shipping. It shapes and slices the work; it does not rank it or set the schedule.
user-story-mapping/SKILL.md, version 1.0.0, about 2,700 words.
By Afeez Adebayo, Marketing, SEO & Growth Expert with 10+ years of experience.
Created 11 November 2026. Updated 11 November 2026. Free to use under CC BY 4.0.
A user story map lays a product out as the story of someone using it. Across the top runs the backbone: the activities and steps a user moves through in the order they happen, read left to right like a sentence. Down each step hang the details, the smaller stories, ordered by priority. Horizontal lines cut the map into releases, and the thinnest end-to-end path through it is the walking skeleton. The technique comes from Jeff Patton, and its purpose is to keep a whole team looking at the user's journey while they decide what to build first, instead of arguing over a flat backlog.
This skill makes an AI agent build a story map from a real user journey, slice it into releases that each serve a named user and a measurable outcome, and find the thin first slice worth shipping. It shapes and slices the work. It does not rank a backlog that is already written, it does not set long-range horizons, and it does not choose which customer problem to solve. Ranking is the prioritisation-frameworks skill. Horizons and stakeholder communication are product-roadmapping. Choosing the problem from customer evidence is opportunity-solution-trees.
When to use this skill, and when not to
Use it when a team needs to break a large feature or product into buildable pieces without losing the big picture, plan a minimum viable release, reorganise a messy backlog around the user's journey, or get product, design and engineering looking at the same picture. Use it when someone says build a story map, map the user journey, what goes in the MVP, slice this into releases, our backlog is a flat list, or we keep building features that do not add up to a usable product.
Do not use it to score or rank items that are already listed; that is the prioritisation-frameworks skill. Do not use it to lay out work across now-next-later horizons or to communicate direction to stakeholders; that is product-roadmapping. Do not use it to decide which customer problem is worth solving in the first place; that is opportunity-solution-trees, and a story map is best built after the problem is chosen. Do not use it when nobody can describe how a user actually moves through the product, because a map built on guesswork will slice the wrong things.
What the agent needs from you before starting
Ask for these before building the map. Do not proceed on assumptions.
- The user and their goal. Who is travelling through this journey, and what are they trying to get done, stated as an end state such as "file an expense claim" rather than a feature name.
- The scope. Whether the map covers a whole product, one feature, or one section. A map with no stated scope sprawls until it is abandoned.
- The journey, or the evidence for it. A walk-through from a user, a recording, a support flow, research notes, or at least a product person who can narrate the real steps. If nobody can tell the end-to-end story, say so and ask for that first.
- The target outcome for the first release. The measurable change the first slice should produce, such as "a new user completes their first claim without support".
If the goal, the journey or the first-release outcome is missing, stop and ask. Do not invent user steps the team has not seen or cannot confirm.
Raw SKILL.md file
This is the exact file agents read, including the credit header and licence notice. Save it as user-story-mapping/SKILL.md.
---
name: user-story-mapping
description: Build a user story map that lays a product out as the story of someone using it, then slice it into releases, using Jeff Patton's method. Carries the real rules: a backbone of user activities and steps as verb phrases read left to right with "then", details hung underneath by priority read with "or", one storyline rather than a flowchart, a mile-wide-inch-deep first pass to avoid map shock, a walking skeleton as the thin first slice, and release lines that each name a target user and a measurable outcome rather than being filled to capacity. Use it when someone says build a story map, map the user journey, what goes in the MVP, slice this into releases, or our backlog is a flat list. Do NOT use it to rank a written backlog (see prioritisation-frameworks), to set now-next-later horizons or communicate the plan (see product-roadmapping), or to choose which problem to solve (see opportunity-solution-trees).
---
# User story mapping
A user story map lays a product out as the story of someone using it. Across the top runs the backbone: the activities and steps a user moves through in the order they happen, read left to right like a sentence. Down each step hang the details, the smaller stories, ordered by priority. Horizontal lines cut the map into releases, and the thinnest end-to-end path through it is the walking skeleton. The technique comes from Jeff Patton, and its purpose is to keep a whole team looking at the user's journey while they decide what to build first, instead of arguing over a flat backlog.
This skill makes an AI agent build a story map from a real user journey, slice it into releases that each serve a named user and a measurable outcome, and find the thin first slice worth shipping. It shapes and slices the work. It does not rank a backlog that is already written, it does not set long-range horizons, and it does not choose which customer problem to solve. Ranking is the prioritisation-frameworks skill. Horizons and stakeholder communication are product-roadmapping. Choosing the problem from customer evidence is opportunity-solution-trees.
## When to use this skill, and when not to
Use it when a team needs to break a large feature or product into buildable pieces without losing the big picture, plan a minimum viable release, reorganise a messy backlog around the user's journey, or get product, design and engineering looking at the same picture. Use it when someone says build a story map, map the user journey, what goes in the MVP, slice this into releases, our backlog is a flat list, or we keep building features that do not add up to a usable product.
Do not use it to score or rank items that are already listed; that is the prioritisation-frameworks skill. Do not use it to lay out work across now-next-later horizons or to communicate direction to stakeholders; that is product-roadmapping. Do not use it to decide which customer problem is worth solving in the first place; that is opportunity-solution-trees, and a story map is best built after the problem is chosen. Do not use it when nobody can describe how a user actually moves through the product, because a map built on guesswork will slice the wrong things.
## What the agent needs from you before starting
Ask for these before building the map. Do not proceed on assumptions.
1. The user and their goal. Who is travelling through this journey, and what are they trying to get done, stated as an end state such as "file an expense claim" rather than a feature name.
2. The scope. Whether the map covers a whole product, one feature, or one section. A map with no stated scope sprawls until it is abandoned.
3. The journey, or the evidence for it. A walk-through from a user, a recording, a support flow, research notes, or at least a product person who can narrate the real steps. If nobody can tell the end-to-end story, say so and ask for that first.
4. The target outcome for the first release. The measurable change the first slice should produce, such as "a new user completes their first claim without support".
If the goal, the journey or the first-release outcome is missing, stop and ask. Do not invent user steps the team has not seen or cannot confirm.
## How to build a user story map, step by step
Follow these in order. The order is the point: the backbone before the detail, the detail before the slicing.
### Step 1. Frame the goal, the user and the scope
Write one line naming the user, their goal and the scope of the map. This is the frame everything hangs on. If two user types travel very different journeys, pick the primary one for this map and note the other rather than stacking both into one tangle.
### Step 2. Lay the backbone left to right
Write the user's activities and steps as short verb phrases, one per card, and place them across the top in the order they happen. Test the backbone by reading it aloud with "then" between the cards: "search for a flight, then choose a fare, then enter passengers, then pay". If it does not read as a sentence, the order or the wording is wrong. Keep this pass high level: get from the beginning of the journey to the end before adding any detail. Patton calls this going a mile wide and an inch deep.
### Step 3. Hang the details underneath, by priority
Under each step, add the smaller stories, options and variations as cards, stacked vertically with the highest priority at the top. Read a column downward with "or" between the cards: "pay by card, or pay by wallet, or pay on account". Keep concurrent users and edge cases as vertical variations under the one storyline. Do not split them into separate maps and do not turn the map into a flowchart of branches; a story map tells one typical flow and shows alternatives below it.
### Step 4. Walk the map and find the gaps
Read the whole map as the user. At each step ask what they would do next, what could go wrong, and what they would need to know. Add the missing cards. Repeat the walk for any secondary user type. This is where a map earns its keep: it surfaces steps a feature list never would.
### Step 5. Find the walking skeleton
Mark the thinnest path across the whole backbone that still lets the target user get from beginning to end. One card per step, the simplest version of each. This is the walking skeleton, and it is the first thing worth building, because it proves the journey works end to end before any step is made rich.
### Step 6. Slice releases against an outcome, not to capacity
Draw a horizontal line. For the release above it, name the target user and the measurable outcome it must produce, then keep only the cards needed to hit that outcome and push everything else below the line. Do not fill a release to the team's capacity; fill it to the outcome and stop. Thin and split the cards that remain above the line so the release stays as small as the outcome allows. Each later release gets its own line, its own target user and its own outcome.
### Step 7. Prune and hand off
Remove cards the team has decided it does not need rather than leaving them on the map "just in case", or move them to a parked area off the map. When a near-term release is agreed, pass only those cards into the delivery tool in small batches. Steps on the backbone usually become epics or features; the detail cards become stories or tasks with acceptance criteria. Ranking those stories is the prioritisation-frameworks skill; sequencing releases across horizons is product-roadmapping.
### Step 8. Run the readiness test
Before handing the map over, read the backbone end to end one more time. If you cannot tell a clear, continuous story of how the user reaches their goal, the map is not ready and the team is not ready to build the feature. Go back to the backbone before writing another story.
## Worked example
Goal handed over: "let a new user file their first expense claim." Scope: the claim-filing feature. User: a first-time employee claimant.
The agent lays a backbone of seven steps, read with "then": open the app, start a claim, add an expense, attach a receipt, categorise it, review the total, then submit. Under "attach a receipt" it hangs details by priority: photograph a receipt, or upload a file, or forward an email. Walking the map as the user surfaces two missing steps, "handle a rejected receipt" and "save a draft", which are added as cards.
The walking skeleton is the thinnest path: open, start, add one expense, photograph one receipt, submit, no categories, no drafts. Release one is sliced against the outcome "a new claimant submits a first claim without contacting support": it keeps the skeleton plus basic validation and drops categories, drafts and bulk upload below the line. Release two takes the outcome "claimants file a full month unaided" and pulls up categories and drafts. The agent hands the release-one cards to the delivery tool and notes that final scope is the team's to confirm.
## Templates you can use verbatim
Map, as indented text any tool can hold:
```
USER + GOAL: <who> wants to <end state> SCOPE: <whole product | feature | section>
BACKBONE (left to right, read with "then"):
[Activity] <group of steps toward a sub-goal>
Step 1 <verb phrase> | Step 2 <verb phrase> | Step 3 <verb phrase> ...
DETAILS (under each step, top = highest priority, read with "or"):
Step 2: <detail a> / <detail b> / <detail c>
RELEASE 1 (target user: <...> outcome: <measurable>) <-- line
<only the cards needed to hit the outcome; the walking skeleton sits here>
RELEASE 2 (target user: <...> outcome: <measurable>) <-- line
<the next thinnest set>
```
Release-slice card:
```
Release: <n>
Target user: <segment>
Outcome it must produce: <measurable change>
In this slice: <cards needed to hit the outcome>
Deferred below the line: <everything not needed yet>
Walking skeleton covered? <yes/no>
```
Backbone check prompt, to run on the top row: "Read left to right with 'then' between each card. Does it tell one continuous user story from start to goal? If a card is a noun or a feature name rather than something the user does, rewrite it as a verb phrase."
## Common mistakes and how to avoid them
1. Losing the story. The map becomes a list of nouns, which is a feature breakdown, not a story. Spot it when cards name components instead of user actions. Fix it by naming the user, setting a start and an end, and writing every backbone card as a short verb phrase.
2. Map shock from too much detail too early. Breaking steps down before the backbone is complete produces hundreds of cards nobody can read. Spot it when the map is deep in one area and empty in others. Fix it by going a mile wide and an inch deep first, then adding detail.
3. Turning the map into a flowchart. Teams argue the one correct order, add every branch, or split parallel users into separate maps. Spot it when arrows and conditionals appear. Fix it by telling one typical flow left to right and showing variations vertically.
4. Releases sliced to capacity, not to an outcome. The team fills each release until the sprint is full. Spot it when a release has no stated user or measurable result. Fix it by naming the target user and outcome for each release and cutting everything not needed to reach it.
5. Building the map alone, then treating it as final. One person drafts it and the team reads it as a finished plan. Spot it when only one role was in the room. Fix it by building the map with product, design and engineering together, and by pruning stale cards rather than hoarding them.
## Quality bar: check the output against this before handing it over
- The map names one user, their goal and a scope in a single frame line.
- The backbone reads left to right as a continuous story with "then" between cards, and every backbone card is a verb phrase, not a noun or a feature name.
- Detail cards sit under their step, ordered by priority, read downward with "or", on one storyline rather than branching flowcharts.
- A walking skeleton is marked: the thinnest end-to-end path through the backbone.
- Every release line names a target user and a measurable outcome, and holds only the cards needed to hit it.
- No user step is invented that the team has not seen or cannot confirm.
- A note tells the human that the final release scope is theirs to confirm, and ranking and sequencing are handed to the named sibling skills.
## Guardrails
- Irreversible actions need a human. Committing a release scope, moving cards into the delivery tool, or telling stakeholders what ships when are decisions for a person. The skill proposes the slice and the skeleton and asks for confirmation before anything is locked.
- Never fabricate the journey. If nobody can describe how the user moves through the product, the honest output is "map the real journey with a user first", not a plausible-looking invented map.
- Protect user data. If the map draws on real user recordings, personas or research, do not paste names, emails or other personal details onto the cards. Describe the user by segment and keep raw research where it lives.
- Mind the cost. A story map is a workshop that takes people's time. Keep the first pass a mile wide and an inch deep so the session produces a usable backbone rather than map shock.
- Stay in scope. This skill shapes and slices the journey. It does not rank stories (prioritisation-frameworks), set horizons or communicate the plan (product-roadmapping), or choose the problem (opportunity-solution-trees). Hand off to those skills by name.
## Tool-specific appendix
The core method is tool-agnostic: the map is a backbone, details and release lines, and the indented-text template holds it anywhere. On a physical or virtual wall (sticky notes, FigJam, Miro, or similar), put activities and steps across the top, details in columns beneath, and release lines as horizontal dividers, and build it with the team in the room rather than alone. In a dedicated story-mapping tool (StoriesOnBoard, Avion, or similar) the backbone and release slices are first-class, so use them and resist the pull to manage the live map inside a ticket tracker, where reordering is slow and parked cards pile up. When a release is agreed, export only those cards into the delivery tool in small batches. Whatever the tool, the steps above do not change; the tool only decides how the map is drawn and where agreed cards go next.
## Sources
- Jeff Patton, "User Story Mapping" and "Why Map User Stories; How to Map User Stories" (the backbone, the narrative flow, slicing a map into viable releases), jpattonassociates.com. Last verified 11 November 2026.
- Jeff Patton, "5 Story Mapping Mistakes" (losing the story, map shock, flowcharting, mapping the whole product for one feature, releases not anchored to outcomes), jpattonassociates.com/5-story-mapping-mistakes. Last verified 11 November 2026.
- Jeff Patton interview, "Getting started with User Story Mapping", Mind the Product (thin slices, releases to an outcome, shared understanding over documents), mindtheproduct.com. Last verified 11 November 2026.
- Mike Cohn, "User Story Mapping: how to create story maps", Mountain Goat Software (read across with "then", down with "or", finding the backbone, slicing releases), mountaingoatsoftware.com. Last verified 11 November 2026.
- Nielsen Norman Group, "User Story Mapping" (activities, steps, details; relation to journey maps; when to use), nngroup.com/articles/user-story-mapping. Last verified 11 November 2026.
- Zarar Siddiqi, "5 Story Mapping Anti-Patterns" (building the map alone, work breakdown instead of a map, skipping release cuts, managing in Jira, stale stickies), bitbytebit.substack.com. Last verified 11 November 2026.
---
1.0.0, 11 November 2026: first release. Use, adapt and share this skill under CC BY 4.0: credit Afeez Adebayo, link afeezadebayo.com and the skill's download page. This is decision-support guidance, not a substitute for mapping the journey with your own users.
How to build a user story map, step by step
Follow these in order. The order is the point: the backbone before the detail, the detail before the slicing.
Step 1. Frame the goal, the user and the scope
Write one line naming the user, their goal and the scope of the map. This is the frame everything hangs on. If two user types travel very different journeys, pick the primary one for this map and note the other rather than stacking both into one tangle.
Step 2. Lay the backbone left to right
Write the user's activities and steps as short verb phrases, one per card, and place them across the top in the order they happen. Test the backbone by reading it aloud with "then" between the cards: "search for a flight, then choose a fare, then enter passengers, then pay". If it does not read as a sentence, the order or the wording is wrong. Keep this pass high level: get from the beginning of the journey to the end before adding any detail. Patton calls this going a mile wide and an inch deep.
Step 3. Hang the details underneath, by priority
Under each step, add the smaller stories, options and variations as cards, stacked vertically with the highest priority at the top. Read a column downward with "or" between the cards: "pay by card, or pay by wallet, or pay on account". Keep concurrent users and edge cases as vertical variations under the one storyline. Do not split them into separate maps and do not turn the map into a flowchart of branches; a story map tells one typical flow and shows alternatives below it.
Step 4. Walk the map and find the gaps
Read the whole map as the user. At each step ask what they would do next, what could go wrong, and what they would need to know. Add the missing cards. Repeat the walk for any secondary user type. This is where a map earns its keep: it surfaces steps a feature list never would.
Step 5. Find the walking skeleton
Mark the thinnest path across the whole backbone that still lets the target user get from beginning to end. One card per step, the simplest version of each. This is the walking skeleton, and it is the first thing worth building, because it proves the journey works end to end before any step is made rich.
Step 6. Slice releases against an outcome, not to capacity
Draw a horizontal line. For the release above it, name the target user and the measurable outcome it must produce, then keep only the cards needed to hit that outcome and push everything else below the line. Do not fill a release to the team's capacity; fill it to the outcome and stop. Thin and split the cards that remain above the line so the release stays as small as the outcome allows. Each later release gets its own line, its own target user and its own outcome.
Step 7. Prune and hand off
Remove cards the team has decided it does not need rather than leaving them on the map "just in case", or move them to a parked area off the map. When a near-term release is agreed, pass only those cards into the delivery tool in small batches. Steps on the backbone usually become epics or features; the detail cards become stories or tasks with acceptance criteria. Ranking those stories is the prioritisation-frameworks skill; sequencing releases across horizons is product-roadmapping.
Step 8. Run the readiness test
Before handing the map over, read the backbone end to end one more time. If you cannot tell a clear, continuous story of how the user reaches their goal, the map is not ready and the team is not ready to build the feature. Go back to the backbone before writing another story.
Worked example
Goal handed over: "let a new user file their first expense claim." Scope: the claim-filing feature. User: a first-time employee claimant.
The agent lays a backbone of seven steps, read with "then": open the app, start a claim, add an expense, attach a receipt, categorise it, review the total, then submit. Under "attach a receipt" it hangs details by priority: photograph a receipt, or upload a file, or forward an email. Walking the map as the user surfaces two missing steps, "handle a rejected receipt" and "save a draft", which are added as cards.
The walking skeleton is the thinnest path: open, start, add one expense, photograph one receipt, submit, no categories, no drafts. Release one is sliced against the outcome "a new claimant submits a first claim without contacting support": it keeps the skeleton plus basic validation and drops categories, drafts and bulk upload below the line. Release two takes the outcome "claimants file a full month unaided" and pulls up categories and drafts. The agent hands the release-one cards to the delivery tool and notes that final scope is the team's to confirm.
Templates you can use verbatim
Map, as indented text any tool can hold:
USER + GOAL: <who> wants to <end state> SCOPE: <whole product | feature | section>
BACKBONE (left to right, read with "then"):
[Activity] <group of steps toward a sub-goal>
Step 1 <verb phrase> | Step 2 <verb phrase> | Step 3 <verb phrase> ...
DETAILS (under each step, top = highest priority, read with "or"):
Step 2: <detail a> / <detail b> / <detail c>
RELEASE 1 (target user: <...> outcome: <measurable>) <-- line
<only the cards needed to hit the outcome; the walking skeleton sits here>
RELEASE 2 (target user: <...> outcome: <measurable>) <-- line
<the next thinnest set>Release-slice card:
Release: <n>
Target user: <segment>
Outcome it must produce: <measurable change>
In this slice: <cards needed to hit the outcome>
Deferred below the line: <everything not needed yet>
Walking skeleton covered? <yes/no>Backbone check prompt, to run on the top row: "Read left to right with 'then' between each card. Does it tell one continuous user story from start to goal? If a card is a noun or a feature name rather than something the user does, rewrite it as a verb phrase."
Common mistakes and how to avoid them
- Losing the story. The map becomes a list of nouns, which is a feature breakdown, not a story. Spot it when cards name components instead of user actions. Fix it by naming the user, setting a start and an end, and writing every backbone card as a short verb phrase.
- Map shock from too much detail too early. Breaking steps down before the backbone is complete produces hundreds of cards nobody can read. Spot it when the map is deep in one area and empty in others. Fix it by going a mile wide and an inch deep first, then adding detail.
- Turning the map into a flowchart. Teams argue the one correct order, add every branch, or split parallel users into separate maps. Spot it when arrows and conditionals appear. Fix it by telling one typical flow left to right and showing variations vertically.
- Releases sliced to capacity, not to an outcome. The team fills each release until the sprint is full. Spot it when a release has no stated user or measurable result. Fix it by naming the target user and outcome for each release and cutting everything not needed to reach it.
- Building the map alone, then treating it as final. One person drafts it and the team reads it as a finished plan. Spot it when only one role was in the room. Fix it by building the map with product, design and engineering together, and by pruning stale cards rather than hoarding them.
Quality bar: check the output against this before handing it over
- The map names one user, their goal and a scope in a single frame line.
- The backbone reads left to right as a continuous story with "then" between cards, and every backbone card is a verb phrase, not a noun or a feature name.
- Detail cards sit under their step, ordered by priority, read downward with "or", on one storyline rather than branching flowcharts.
- A walking skeleton is marked: the thinnest end-to-end path through the backbone.
- Every release line names a target user and a measurable outcome, and holds only the cards needed to hit it.
- No user step is invented that the team has not seen or cannot confirm.
- A note tells the human that the final release scope is theirs to confirm, and ranking and sequencing are handed to the named sibling skills.
Guardrails
- Irreversible actions need a human. Committing a release scope, moving cards into the delivery tool, or telling stakeholders what ships when are decisions for a person. The skill proposes the slice and the skeleton and asks for confirmation before anything is locked.
- Never fabricate the journey. If nobody can describe how the user moves through the product, the honest output is "map the real journey with a user first", not a plausible-looking invented map.
- Protect user data. If the map draws on real user recordings, personas or research, do not paste names, emails or other personal details onto the cards. Describe the user by segment and keep raw research where it lives.
- Mind the cost. A story map is a workshop that takes people's time. Keep the first pass a mile wide and an inch deep so the session produces a usable backbone rather than map shock.
- Stay in scope. This skill shapes and slices the journey. It does not rank stories (prioritisation-frameworks), set horizons or communicate the plan (product-roadmapping), or choose the problem (opportunity-solution-trees). Hand off to those skills by name.
Tool-specific appendix
The core method is tool-agnostic: the map is a backbone, details and release lines, and the indented-text template holds it anywhere. On a physical or virtual wall (sticky notes, FigJam, Miro, or similar), put activities and steps across the top, details in columns beneath, and release lines as horizontal dividers, and build it with the team in the room rather than alone. In a dedicated story-mapping tool (StoriesOnBoard, Avion, or similar) the backbone and release slices are first-class, so use them and resist the pull to manage the live map inside a ticket tracker, where reordering is slow and parked cards pile up. When a release is agreed, export only those cards into the delivery tool in small batches. Whatever the tool, the steps above do not change; the tool only decides how the map is drawn and where agreed cards go next.
Sources
- Jeff Patton, "User Story Mapping" and "Why Map User Stories; How to Map User Stories" (the backbone, the narrative flow, slicing a map into viable releases), jpattonassociates.com. Last verified 11 November 2026.
- Jeff Patton, "5 Story Mapping Mistakes" (losing the story, map shock, flowcharting, mapping the whole product for one feature, releases not anchored to outcomes), jpattonassociates.com/5-story-mapping-mistakes. Last verified 11 November 2026.
- Jeff Patton interview, "Getting started with User Story Mapping", Mind the Product (thin slices, releases to an outcome, shared understanding over documents), mindtheproduct.com. Last verified 11 November 2026.
- Mike Cohn, "User Story Mapping: how to create story maps", Mountain Goat Software (read across with "then", down with "or", finding the backbone, slicing releases), mountaingoatsoftware.com. Last verified 11 November 2026.
- Nielsen Norman Group, "User Story Mapping" (activities, steps, details; relation to journey maps; when to use), nngroup.com/articles/user-story-mapping. Last verified 11 November 2026.
- Zarar Siddiqi, "5 Story Mapping Anti-Patterns" (building the map alone, work breakdown instead of a map, skipping release cuts, managing in Jira, stale stickies), bitbytebit.substack.com. Last verified 11 November 2026.
--- 1.0.0, 11 November 2026: first release. Use, adapt and share this skill under CC BY 4.0: credit Afeez Adebayo, link afeezadebayo.com and the skill's download page. This is decision-support guidance, not a substitute for mapping the journey with your own users.
On this page
- When to use this skill, and when not to
- Who it is for
- What is inside
- Example prompts
- Example output
- What the agent needs from you
- How to install and use it
- How to build a user story map step by step
- Worked example
- Situations this skill handles
- What makes this skill different
- Common mistakes
- Related skills
- Frequently asked questions
- Changelog
When to use this skill, and when not to
Use it when a team needs to break a large feature or product into buildable pieces without losing the big picture, plan a minimum viable release, reorganise a flat backlog around the user’s journey, or get product, design and engineering looking at one picture. Reach for it when someone says build a story map, map the user journey, what goes in the MVP, or our backlog is a flat list. It does not rank a written backlog, which is the prioritisation-frameworks skill, it does not set now-next-later horizons, which is product-roadmapping, and it does not choose which problem to solve, which is opportunity-solution-trees.
Who it is for
Product managers, delivery leads and founders who need a team to agree what the first release is. It suits groups that keep shipping features that do not add up to a usable product, and that want product, design and engineering shaping the plan from the same picture rather than a flat list of tickets.
What is inside
An eight-step method that builds the backbone first, adds detail by priority, finds the walking skeleton, and slices releases against an outcome. It carries the rules that keep a map honest: verb-phrase cards read left to right with ‘then’, details read down with ‘or’, one storyline rather than a flowchart, a mile-wide-inch-deep first pass to avoid map shock, and release lines that each name a target user and a measurable outcome. It ends with a readiness test and a quality bar the agent runs against its own map.
Example prompts
‘Turn this feature into a user story map.’ ‘What goes in the MVP for this journey?’ ‘Slice this map into releases.’ ‘Our backlog is a flat list, reorganise it around the user.’ ‘Find the walking skeleton for this product.’ ‘Map the steps a new user takes to their first result.’
Example output
A story map with a backbone that reads as one continuous user story, details hung under each step by priority, a marked walking skeleton, and release lines that each name a target user and a measurable outcome. Anything not needed to hit the first outcome sits below the line. No user step is invented that the team has not seen, and a note reminds the human that the final release scope is theirs to confirm.
What the agent needs from you
The user and their goal, stated as an end state such as ‘file an expense claim’ rather than a feature name. The scope: a whole product, one feature, or one section. The real journey, or evidence for it: a walk-through, a recording, a support flow, or someone who can narrate the steps. And the measurable outcome the first release should produce. If nobody can tell the end-to-end story, the agent asks for that before building.
How to install and use it
Download the SKILL.md from this page, put it in a folder named user-story-mapping, and add it to your agent’s skills directory. In Claude Code or Codex that is the skills folder in your project or home directory; in the Claude apps, upload the single-skill file from this page. Then give the agent the user, the journey and the first-release outcome and ask it to build the map.
How to build a user story map step by step
Install the skill as user-story-mapping/SKILL.md, give the agent the user, the journey and the first-release outcome, and it works the eight steps in order: frame the goal, user and scope; lay the backbone left to right as verb phrases; hang details underneath by priority; walk the map as the user to find gaps; mark the walking skeleton; slice releases against an outcome rather than to capacity; prune and hand off; and run a readiness test. The order is the point: the backbone before the detail, the detail before the slicing.
Worked example
Asked to let a new employee file a first expense claim, the agent lays a seven-step backbone, open then start then add then attach then categorise then review then submit, and hangs details under ‘attach a receipt’. Walking the map surfaces two missing steps, a rejected receipt and a saved draft. The walking skeleton is the thinnest path through it. Release one is sliced against ‘a new claimant submits without contacting support’ and drops categories and drafts below the line; release two picks them up. The agent hands the release-one cards over and notes the final scope is the team’s to confirm.
Situations this skill handles
| Situation | What the skill does |
|---|---|
| A large feature that will not fit in one release | Builds a backbone and slices it into releases against outcomes |
| A flat backlog nobody can prioritise | Reorganises the work around the user’s journey |
| A team unsure what the MVP is | Marks the walking skeleton as the thin first slice worth shipping |
| Cards that name components, not user actions | Rewrites the backbone as verb phrases that read as one story |
| Releases filled to the sprint’s capacity | Anchors each release to a target user and a measurable outcome |
What makes this skill different
Most story-mapping guides explain the grid and stop, and popular agent versions list seven steps but point at template files that are not in the bundle and never loop back to rework. This skill is self-contained, with an explicit rework loop and a readiness test. It gives the decision rule rivals skip: a release is defined by a target user and a measurable outcome, and everything not needed to hit it goes below the line. It is tool-agnostic, so the same map works on a wall or in a dedicated tool, and it refuses to build a map when nobody can describe the real journey.
Common mistakes
Losing the story, when every card is a noun and the map is a feature list. Map shock, from breaking steps down before the backbone is complete. Turning the map into a flowchart of branches instead of one storyline. Slicing releases to capacity rather than to an outcome. Building the map alone and treating it as final. The skill guards against each with verb-phrase cards, a mile-wide-inch-deep first pass, one storyline with vertical variations, outcome-anchored release lines, and a whole-team build.
Related skills
Pair it with prioritisation-frameworks, which ranks the stories a map produces, and product-roadmapping, which sequences releases across horizons and communicates them. It works best after opportunity-solution-trees has chosen the problem worth solving. For the wider toolkit, see the Product Management category.
Frequently asked questions
What is a user story map?
A two-dimensional map, from Jeff Patton, that lays a product out as the story of someone using it. Across the top is the backbone of user steps in order; down each step hang the smaller stories by priority; horizontal lines slice the map into releases. It keeps a whole team looking at the user’s journey while they decide what to build first.
How is a story map different from a flat backlog?
A backlog is a list with no shape, so it is hard to see what adds up to a usable product. A story map arranges the same work along the user’s journey, which makes gaps, priorities and the thinnest shippable slice visible. You still hand individual stories to a backlog for delivery, but you decide their shape on the map first.
What is the walking skeleton?
The thinnest path across the whole backbone that still lets the target user get from beginning to end, one simple card per step. It is the first thing worth building, because it proves the journey works end to end before any step is made rich. The first release is usually the walking skeleton plus whatever an outcome demands.
How do I decide what goes in the MVP?
Name the target user and the measurable outcome the first release must produce, then keep only the cards needed to hit that outcome and push everything else below the line. Do not fill the release to the team’s capacity; fill it to the outcome and stop. That keeps the first release as small as the result allows.
How detailed should the first pass be?
A mile wide and an inch deep. Get the backbone from the beginning of the journey to the end at a high level before breaking any step into detail. Diving deep into one area first produces map shock, hundreds of cards nobody can read, and leaves the rest of the journey blank.
Can the agent commit the release scope on its own?
No. The skill proposes the slice and the walking skeleton, but committing a release scope, moving cards into the delivery tool, or telling stakeholders what ships when are decisions for a person. It asks for explicit confirmation before anything is locked.