Planning and Task Management skill 13 of 13
Quarterly Planning and Review SKILL.md
The Quarterly Planning and Review skill makes Claude, Codex or another AI agent run a quarterly review and plan with you. It scores last quarter's goals with evidence, names wins and root causes of misses, audits where time and energy went, decides what to keep, stop, shrink and start, sets next quarter's objectives, maps them onto a 13-week plan with milestones and protects the time in your calendar.
quarterly-planning-review/SKILL.md, version 1.0.0, 1,504 words.
By Afeez Adebayo, Marketing, SEO & Growth Expert with 10+ years of experience.
Created 10 October 2026. Updated 10 October 2026. Free to use under CC BY 4.0.
A week is too short to see direction and a year is too long to steer. The quarter, about 13 weeks, is long enough to finish meaningful work and short enough to keep urgency. Yet most people never stop to ask what the last quarter actually achieved, which projects should end, or what the next 13 weeks are for. Work rolls forward on momentum, and goals set in January quietly expire. Approaches such as Brian Moran's The 12 Week Year argue for treating each quarter as a full planning cycle for this reason. [Reference, The 12 Week Year]
This skill runs a half-day (or two-hour) quarterly review and plan for a person or small team. It reviews results against goals, looks at where time actually went, keeps, stops or starts projects and commitments, sets the next quarter's objectives, maps them onto a 13-week plan with milestones and protects the time needed in the calendar.
Operating principles
- Evidence first. Start with what happened, using numbers, calendars and notes, not memory.
- Stop before you start. Every new commitment needs something to end, shrink or pause.
- Few objectives. One to three for a person, three to five for a team.
- Plan in weeks. Milestones by week make a quarter concrete.
- Protect the plan. Time for priorities goes into the calendar before the quarter begins.
Inputs
- Last quarter's goals or OKRs and scores.
- Weekly review notes and lesson log.
- Calendar for the quarter (meeting load, travel, holidays).
- Project list and task list.
- Upcoming fixed dates: launches, deadlines, holidays, events.
- For teams: each member's capacity and the wider company goals.
When to use, and when not to
Use it at the end of each quarter, at the start of a new role or business year, after a major change, or when work feels busy but directionless.
Don't use it for weekly planning (weekly-review) or for company-wide strategy across many teams (the Product Management category).
Raw SKILL.md file
This is the exact file agents read, including the credit header and licence notice. Save it as quarterly-planning-review/SKILL.md.
--- name: quarterly-planning-review description: "Run a quarterly review and plan for a person or small team: goal scores with evidence, wins, misses and root causes, an agent-prepared time and energy audit, keep, stop, shrink and start decisions, next quarter's objectives, a 13-week plan with milestones, a capacity check, calendar protection and risks. Use whenever someone wants a quarterly review, to plan the next quarter or 12 weeks, to reflect on what worked, to reset after a busy period or to set team quarterly priorities." license: CC-BY-4.0 metadata: author: Afeez Adebayo author_url: https://afeezadebayo.com author_linkedin: https://www.linkedin.com/in/afeez-adebayo/ author_x: https://x.com/za_icon source: https://afeezadebayo.com/skills-md/productivity/planning-tasks/quarterly-planning-review/ category: productivity subcategory: planning-tasks version: "1.0.0" created: "2026-10-10" updated: "2026-10-13" --- # Quarterly Planning and Review A week is too short to see direction and a year is too long to steer. The quarter, about 13 weeks, is long enough to finish meaningful work and short enough to keep urgency. Yet most people never stop to ask what the last quarter actually achieved, which projects should end, or what the next 13 weeks are for. Work rolls forward on momentum, and goals set in January quietly expire. Approaches such as Brian Moran's The 12 Week Year argue for treating each quarter as a full planning cycle for this reason. [Reference, The 12 Week Year] This skill runs a half-day (or two-hour) quarterly review and plan for a person or small team. It reviews results against goals, looks at where time actually went, keeps, stops or starts projects and commitments, sets the next quarter's objectives, maps them onto a 13-week plan with milestones and protects the time needed in the calendar. ## Operating principles 1. **Evidence first.** Start with what happened, using numbers, calendars and notes, not memory. 2. **Stop before you start.** Every new commitment needs something to end, shrink or pause. 3. **Few objectives.** One to three for a person, three to five for a team. 4. **Plan in weeks.** Milestones by week make a quarter concrete. 5. **Protect the plan.** Time for priorities goes into the calendar before the quarter begins. ## Inputs - Last quarter's goals or OKRs and scores. - Weekly review notes and lesson log. - Calendar for the quarter (meeting load, travel, holidays). - Project list and task list. - Upcoming fixed dates: launches, deadlines, holidays, events. - For teams: each member's capacity and the wider company goals. ## When to use, and when not to Use it at the end of each quarter, at the start of a new role or business year, after a major change, or when work feels busy but directionless. Don't use it for weekly planning (`weekly-review`) or for company-wide strategy across many teams (the Product Management category). ## Workflow ### Part 1. Review the quarter (45 to 60 minutes) 1. **Score goals:** each key result from 0 to 1.0, with one line on why. 2. **Wins:** the five most important things finished, including unplanned ones. 3. **Misses:** what slipped and the root cause (too many goals, poor estimates, dependencies, energy, priorities changed). 4. **Time audit:** the agent summarises the calendar: hours in meetings, focus blocks, travel and the share of time on goal work. 5. **Energy and wellbeing check:** what drained and what energised; any signs of overload. 6. **Lessons:** three lessons to carry forward. ### Part 2. Decide what to keep, stop and start (30 minutes) | Decision | Questions | |---|---| | Keep | Which projects and habits clearly moved goals? | | Stop | Which meetings, projects or commitments added little? Who needs telling? | | Shrink | What can continue with less time? | | Start | Which new opportunities matter most next quarter? | ### Part 3. Plan the next quarter (45 to 60 minutes) 7. **Objectives and key results:** use `goal-setting-okrs`. 8. **Fixed dates:** holidays, launches, travel and deadlines on a 13-week view. 9. **Milestones by week:** what must be true by weeks 4, 8 and 13 for each key result. 10. **Capacity check:** hours needed against hours available after meetings and fixed commitments; cut if over. 11. **Calendar protection:** recurring focus blocks, the weekly review slot and key milestone check-ins. 12. **Risks:** the two or three things most likely to derail the plan, with a response for each. 13. **Share:** with a manager, team or accountability partner, if useful. ## 13-week plan template ``` | Week | Dates | Fixed events | Milestones | Focus blocks | | 1 | 6-10 Jan | Team offsite | KR1 baseline measured | Tue, Thu am | | 4 | 27-31 Jan | | Case study 1 published | Tue, Thu am | | 8 | 24-28 Feb | Conference | 50% of KR2 | Mon, Wed am | | 13 | 31 Mar-4 Apr | Quarter end | Review and score | | ``` ## Agent preparation Before the session, the agent prepares: ``` Goals and scores so far: KR1 0.8, KR2 0.4, KR3 1.0 Completed projects: 6 | Slipped: 3 Calendar: 41% meetings, 18% focus blocks, 6 days travel Weekly review lessons (top recurring): late inputs from design; Monday overload Upcoming fixed dates next quarter: 3 holidays, 1 launch, 1 conference ``` ## Output format ``` # Quarterly review and plan: <person or team>, <quarter> ## Scores and wins ## Misses and root causes ## Time and energy audit ## Keep, stop, shrink, start ## Next quarter's objectives and key results ## 13-week plan with milestones ## Capacity check and calendar protection ## Risks and responses ## Lessons to carry forward ``` ## Monthly check-ins A 20-minute check at weeks 4 and 8 keeps the plan alive: compare milestones with reality, update key result confidence, move one focus block if a goal is at risk, and drop or shrink anything that no longer fits. Small corrections at these points prevent a surprising score at quarter end. ## Annual view At the end of each year, review four quarterly summaries together. Look for goals that repeated without progress, time that kept going to meetings and the projects that produced most results. Use those patterns to set one or two themes for the year, then let each quarter choose specific objectives within them. ## Where to keep the plan Save each quarter as `quarters/<year>-Q<n>.md` beside `goals.md`, so the agent can prepare the next review from real history instead of memory. ## Edge cases and judgement calls | Situation | What to do | |---|---| | No goals were set last quarter | Review wins, misses and time use, then set goals for the first time | | Quarter was disrupted (illness, job change) | Score kindly, record the context and plan a lighter quarter | | Meetings take over half the week | Make reducing meetings a key result | | Team members have very different capacity | Plan by person, not by average | | Company goals change mid-quarter | Run a short re-plan; drop goals openly | ## Handoffs to related skills - Writing objectives and key results: `goal-setting-okrs` - Weekly execution: `weekly-review` - Breaking initiatives into steps: `project-breakdown` - Protecting time: `time-blocking` - Routines for the quarter: `habits-routines` - System problems found in the review: `productivity-system-audit` ## Worked example A head of content reviews the quarter. The agent's summary shows scores of 0.9, 0.5 and 0.3, 46% of time in meetings and a recurring lesson about late inputs from design. Wins include a research report that drove most new subscribers. The review stops two low-value weekly meetings, shrinks a social project and keeps the research programme. Next quarter's objectives focus on two research reports and a newsletter relaunch, with milestones at weeks 4, 8 and 13, a design hand-off agreement to fix the late inputs and two protected writing mornings each week. The plan fits after cutting one smaller key result. ## Common mistakes - Planning without reviewing. - Adding goals without stopping anything. - No weekly milestones, so the quarter drifts. - Ignoring holidays and travel in capacity. - Leaving the plan out of the calendar. ## Running it with a team Give each person 20 minutes to review their own quarter first. Then meet for 90 minutes: share scores and lessons, agree team keep, stop and start decisions, set three to five team objectives with one owner per key result, and map milestones. End with each person's personal objectives linked to team key results and a date for the first monthly check. ## Self-check before you answer - Were goals scored with evidence and root causes named? - Did something stop or shrink before new work started? - Does the plan have weekly milestones and a capacity check? - Are focus blocks and reviews in the calendar? --- Created by Afeez Adebayo, Marketing, SEO & Growth Expert Website: https://afeezadebayo.com LinkedIn: https://www.linkedin.com/in/afeez-adebayo/ X: https://x.com/za_icon Source: https://afeezadebayo.com/skills-md/productivity/planning-tasks/quarterly-planning-review/ Licence: CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/). You may copy, share and adapt this skill, including for commercial use, as long as you credit Afeez Adebayo and link to the source URL above. Keep this notice in any copy or adapted version.
Workflow
Part 1. Review the quarter (45 to 60 minutes)
- Score goals: each key result from 0 to 1.0, with one line on why.
- Wins: the five most important things finished, including unplanned ones.
- Misses: what slipped and the root cause (too many goals, poor estimates, dependencies, energy, priorities changed).
- Time audit: the agent summarises the calendar: hours in meetings, focus blocks, travel and the share of time on goal work.
- Energy and wellbeing check: what drained and what energised; any signs of overload.
- Lessons: three lessons to carry forward.
Part 2. Decide what to keep, stop and start (30 minutes)
| Decision | Questions |
|---|---|
| Keep | Which projects and habits clearly moved goals? |
| Stop | Which meetings, projects or commitments added little? Who needs telling? |
| Shrink | What can continue with less time? |
| Start | Which new opportunities matter most next quarter? |
Part 3. Plan the next quarter (45 to 60 minutes)
- Objectives and key results: use
goal-setting-okrs. - Fixed dates: holidays, launches, travel and deadlines on a 13-week view.
- Milestones by week: what must be true by weeks 4, 8 and 13 for each key result.
- Capacity check: hours needed against hours available after meetings and fixed commitments; cut if over.
- Calendar protection: recurring focus blocks, the weekly review slot and key milestone check-ins.
- Risks: the two or three things most likely to derail the plan, with a response for each.
- Share: with a manager, team or accountability partner, if useful.
13-week plan template
| Week | Dates | Fixed events | Milestones | Focus blocks |
| 1 | 6-10 Jan | Team offsite | KR1 baseline measured | Tue, Thu am |
| 4 | 27-31 Jan | | Case study 1 published | Tue, Thu am |
| 8 | 24-28 Feb | Conference | 50% of KR2 | Mon, Wed am |
| 13 | 31 Mar-4 Apr | Quarter end | Review and score | |Agent preparation
Before the session, the agent prepares:
Goals and scores so far: KR1 0.8, KR2 0.4, KR3 1.0
Completed projects: 6 | Slipped: 3
Calendar: 41% meetings, 18% focus blocks, 6 days travel
Weekly review lessons (top recurring): late inputs from design; Monday overload
Upcoming fixed dates next quarter: 3 holidays, 1 launch, 1 conferenceOutput format
# Quarterly review and plan: <person or team>, <quarter>
## Scores and wins
## Misses and root causes
## Time and energy audit
## Keep, stop, shrink, start
## Next quarter's objectives and key results
## 13-week plan with milestones
## Capacity check and calendar protection
## Risks and responses
## Lessons to carry forwardMonthly check-ins
A 20-minute check at weeks 4 and 8 keeps the plan alive: compare milestones with reality, update key result confidence, move one focus block if a goal is at risk, and drop or shrink anything that no longer fits. Small corrections at these points prevent a surprising score at quarter end.
Annual view
At the end of each year, review four quarterly summaries together. Look for goals that repeated without progress, time that kept going to meetings and the projects that produced most results. Use those patterns to set one or two themes for the year, then let each quarter choose specific objectives within them.
Where to keep the plan
Save each quarter as quarters/<year>-Q<n>.md beside goals.md, so the agent can prepare the next review from real history instead of memory.
Edge cases and judgement calls
| Situation | What to do |
|---|---|
| No goals were set last quarter | Review wins, misses and time use, then set goals for the first time |
| Quarter was disrupted (illness, job change) | Score kindly, record the context and plan a lighter quarter |
| Meetings take over half the week | Make reducing meetings a key result |
| Team members have very different capacity | Plan by person, not by average |
| Company goals change mid-quarter | Run a short re-plan; drop goals openly |
Handoffs to related skills
- Writing objectives and key results:
goal-setting-okrs - Weekly execution:
weekly-review - Breaking initiatives into steps:
project-breakdown - Protecting time:
time-blocking - Routines for the quarter:
habits-routines - System problems found in the review:
productivity-system-audit
Worked example
A head of content reviews the quarter. The agent's summary shows scores of 0.9, 0.5 and 0.3, 46% of time in meetings and a recurring lesson about late inputs from design. Wins include a research report that drove most new subscribers. The review stops two low-value weekly meetings, shrinks a social project and keeps the research programme. Next quarter's objectives focus on two research reports and a newsletter relaunch, with milestones at weeks 4, 8 and 13, a design hand-off agreement to fix the late inputs and two protected writing mornings each week. The plan fits after cutting one smaller key result.
Common mistakes
- Planning without reviewing.
- Adding goals without stopping anything.
- No weekly milestones, so the quarter drifts.
- Ignoring holidays and travel in capacity.
- Leaving the plan out of the calendar.
Running it with a team
Give each person 20 minutes to review their own quarter first. Then meet for 90 minutes: share scores and lessons, agree team keep, stop and start decisions, set three to five team objectives with one owner per key result, and map milestones. End with each person's personal objectives linked to team key results and a date for the first monthly check.
Self-check before you answer
- Were goals scored with evidence and root causes named?
- Did something stop or shrink before new work started?
- Does the plan have weekly milestones and a capacity check?
- Are focus blocks and reviews in the calendar?
On this page
- When to use this skill, and when not to
- Example prompts
- Example output
- What the agent needs from you
- How this skill hands off to related skills
- How to run Quarterly Planning and Review step by step
- Situations this skill handles
- What makes this skill different
- Practical tips from real projects
- Frequently asked questions
- Changelog
When to use this skill, and when not to
Use it at the end of each quarter, at the start of a new role or business year, after a major change, or when work feels busy but directionless.
A quarter is long enough to finish meaningful work and short enough to keep urgency, yet most people never stop to ask what the last one achieved or what the next 13 weeks are for.
Don’t use it for weekly planning (use the Weekly Review) or for company-wide strategy across many teams.
Example prompts
- “Plan my next 13 weeks.”
- “Run my quarterly review from my goals and calendar.”
- “What should I stop doing next quarter?”
- “Set team priorities for the quarter.”
- “Build milestones for weeks 4, 8 and 13.”
Example output
The skill returns a fixed structure. A shortened example for an imaginary site:
Scores: KR1 0.9, KR2 0.5, KR3 0.3 Time: 46% meetings, 18% focus blocks Stop: two low-value weekly meetings | Shrink: social project | Keep: research programme Next quarter: 2 research reports, newsletter relaunch Milestones: weeks 4, 8 and 13 | Focus: two writing mornings a week Risk: late design inputs, fixed with a hand-off agreement
Nothing new starts until something stops or shrinks, and the plan is not finished until focus blocks are in the calendar.
What the agent needs from you
The skill asks for last quarter's goals and scores, weekly review notes, the quarter's calendar, your project and task lists, upcoming fixed dates and, for teams, each person's capacity and wider company goals.
How this skill hands off to related skills
Quarterly Planning and Review connects to Goal Setting and OKRs, the Weekly Review and Habits and Routines, plus project breakdown, time blocking and the productivity system audit in the Planning and Task Management skills.
How to run Quarterly Planning and Review step by step
- Install the skill as
quarterly-planning-review/SKILL.md. - Book half a day at quarter end.
- Let the agent prepare scores and a time audit.
- Decide keep, stop, shrink and start.
- Set objectives and a 13-week plan.
- Protect focus time in the calendar.
Situations this skill handles
Quarters rarely go to plan. The skill handles these:
| Situation | What the skill does |
|---|---|
| No goals last quarter | Review, then first goals |
| Disrupted quarter | Scored kindly, lighter plan |
| Meetings over half the week | Fewer meetings as a key result |
| Uneven team capacity | Plan by person |
| Company goals change | Short re-plan |
| Annual planning | Four quarters reviewed together |
What makes this skill different
Most planning templates start with new goals. This skill starts with evidence, from scores to a time audit, and forces a stop or shrink decision before anything new begins.
Weekly milestones and calendar protection turn the plan into weeks you can actually see, and monthly check-ins keep it alive.
Practical tips from real projects
- Evidence first.
- Stop before you start.
- Plan in weeks.
- Protect the plan.
A worked example: a head of content reviews the quarter. The agent summary shows scores of 0.9, 0.5 and 0.3, 46% of time in meetings and a recurring lesson about late inputs from design. Wins include a research report that drove most new subscribers. The review stops two low-value weekly meetings, shrinks a social project and keeps the research programme. Next quarter focuses on two research reports and a newsletter relaunch, with milestones at weeks 4, 8 and 13, a design hand-off agreement to fix the late inputs and two protected writing mornings each week. The plan fits after cutting one smaller key result.
The session runs in three parts. The review scores each key result from 0 to 1.0 with one line on why, lists the five most important wins including unplanned ones, names the root causes of misses such as too many goals, poor estimates, dependencies or energy, audits the calendar for meeting hours, focus time and travel, checks energy and overload and records three lessons.
The decision part asks four questions: which projects and habits clearly moved goals and should be kept, which meetings or commitments added little and should stop, what can continue with less time and which new opportunities matter most. Anyone affected by a stop decision is told.
The planning part sets objectives and key results, places holidays, launches, travel and deadlines on a 13-week view, defines what must be true by weeks 4, 8 and 13, checks hours needed against hours available and cuts if over, books recurring focus blocks and the weekly review, names the two or three biggest risks with a response for each and shares the plan with a manager or accountability partner if useful.
Before the session, the agent prepares a summary: scores so far, completed and slipped projects, the share of time in meetings and focus blocks, the most common lessons from weekly reviews and fixed dates next quarter. That preparation turns hours of digging into minutes of decisions.
Short check-ins at weeks 4 and 8 compare milestones with reality, update confidence and move a focus block when a goal is at risk. Each quarter is saved as a dated file beside the goals file, and at year end four quarterly summaries are reviewed together to spot goals that repeated without progress and set one or two themes for the next year.
For teams, each person spends 20 minutes reviewing their own quarter first. The team then meets for 90 minutes to share scores and lessons, agree keep, stop and start decisions, set three to five team objectives with one owner per key result and map milestones, ending with personal objectives linked to team key results. A disrupted quarter, such as one with illness or a job change, is scored kindly with the context recorded and followed by a lighter plan, and when meetings take over half the week, reducing them becomes a key result of its own.
Frequently asked questions
What is a quarterly review?
A session to score the last quarter, learn from wins and misses, decide what to stop and start, and plan the next 13 weeks.
How long does a quarterly review take?
About half a day, or two hours for a shorter version.
Why plan in quarters?
Thirteen weeks is long enough for meaningful work and short enough to keep urgency.
What is a 13-week plan?
A week-by-week view of fixed events, milestones and focus blocks for the quarter.
How does the AI agent help?
It prepares scores, completed and slipped projects, a calendar time audit and recurring lessons before the session.
Can teams use it?
Yes. Each person reviews first, then the team agrees decisions, objectives, owners and milestones.
Changelog
- 1.0.0, 10 October 2026: first release.
Use, adapt and share this skill under CC BY 4.0: credit Afeez Adebayo and link to this page.